The following configurations can be made
Risk Types:
- Categorizes the different types of risks/hazards to be tracked in the system as displayed in the ideas performance tab. e.g. Business/Financial Risks, Health/Safety/Environmental Risks, etc.
Probability/Likelihood:
- Specify the different probabilities that can be assigned to a risk. This is the likelihood of the risk/hazard occurring. e.g. Rare, etc.
- The ability to reorder can be done by using the position column.
Consequences:
- Specify the different consequences (levels of impact) that can be assigned to a risk/hazard.
- The ability to reorder can be done by using the position column.
Severities:
- Specify the different severities in the system. That is the amount of damage or harm a risk/hazard could cause.
Severity Matrix:
- Specify the matrix to assign the severity a risk should be given based on the probability and consequence.