In This Article
Step-by-Step Integration Process
Prerequisites: Integrating PowerBI into WiredUp - Part 1
Overview
Once your PowerBI Report embedding has been set up, you can now integrate that report into your WiredUp system. This article provides a step-by-step approach on how the PowerBI integration into WiredUp can be achieved.
Step-by-Step Integration Process
Ensure your service account has been added to your PowerBI workspace before attempting the integration
Step 1: Access WiredUp Configuration
- Log into the WiredUp portal
- For PMO clients, navigate to "Portfolios" and for CI clients, navigate to "Administration > Organisational Structure"
- Select "Site Configuration" from the 3-bar menu
- Navigate to "Settings" under the "System" section
- On the Settings screen, click on Reports and complete the following fields:
- Power BI Client ID & Power BI Client Secret Key from the app registration step.
- Admin Azure username of the service account
- Admin Azure Password of the service account
- Azure Tenant ID: This is the Directory ID located under Azure Active Directory
Step 3: Embedding your PowerBI Report
- Navigate to the "Site Configuration" settings in Portfolios or Organisational Structure
- Select "Power BI Reports" under the "General" section
- Click on "+Add" to add a new report and complete the following:
- Name of the report
- Embed (Report) URL. To obtain your embed URL, follow the steps below
- In your PowerBI report, click on "File" in the top menu
- Select "Embed report"
- Choose "SharePoint Online"
- Copy the generated URL
- Paste this URL into the WiredUp configuration
- Group ID - Found in the URL of your PowerBI report (not the SharePoint link)
- Report ID – Found in the URL of your PowerBI report
- Dataset ID - Click on “datasets” section in the app workspace in Power BI Service and select the dataset of the report. The dataset ID is visible in the dataset URL.
- Roles - Select the Roles that can view this report (e.g. BI team, Administrator etc.). This access is configured on Administration > Roles when the 'View Power BI Reports' permission is enabled.
Step 4: Verify Integration
- Navigate to the "Reports" section in WiredUp
- Locate your newly added report
- Verify that the report loads correctly
- Test access with different user roles to ensure proper permissions
Troubleshooting Tips
- Verify that you're using the PowerBI report URL (not SharePoint embed URL) when collecting Group and Report IDs
- Double-check that all three IDs (Group, Report, Dataset) are correctly entered
- If the report doesn't load, verify that the embed URL was generated correctly from PowerBI
- Contact your system administrator if you encounter permission issues