Run-rate targets are now calculated when the cumulative benefits report loads. The target values will be cached.

The run-rate target is calculated as Target Amount * Stage Benefit Target Percent


For example:

Target amount: $1M

Stage Benefit Percent: Cash Flowing default of 50%

Run-rate target for cash flowing = $1M * 50% = $500K ($0.5M)