29/05/2025
The following is included in version 2.11.0
New Features:
- APIs
- Implemented a new API for retrieving Pipeline Targets.
- Added primary keys to the Bulk Data Ideas for improved data integrity.
- Dashboards
- Enhanced the KPI Chart widget to include multi-site capability, allowing for improved data visualization across sites.
- Added a 'Status' field to the Top25 widget configuration for better filtering options.
- Enhanced the KPI Chart widget to include multi-site capability, allowing for improved data visualization across sites.
- Cash Flow Enhancements
- Optimized table view to automatically focus on current and previous month columns.
- Implemented data integrity measures to prevent Y1 and Discount Rate modifications when Investment Evaluation table is locked.
- Added warning notifications in the Investment Evaluation table when:
- Discount Rate site setting is modified.
- Cash Flow item type is changed to 'Capex'.
- Annual Growth Rate value is removed (reverted to null).
- Emissions Management
- Implemented audit tracking for '+Add Fuel Type' row values in the Fuel Type table.
- Added preventative warning on the Activities page when attempting to change the Organization Structure for activities currently in use on the Scenario Planning page.
- Implemented audit tracking for '+Add Fuel Type' row values in the Fuel Type table.
- Ideas/Initiatives Enhancements
- Introduced new 'Variable' node type for VDT with comprehensive functionality:
- Excel template import support.
- VDT Library storage and import capabilities.
- Visibility in Initiative Benefit Grid View.
- Excel template import support.
- Improved 'Stage' column sorting on Initiative/Idea lists to follow stage progression logic instead of alphabetical order.
- Extended copy functionality to support Emission-enabled Initiatives with their associated scopes.
- Introduced new 'Variable' node type for VDT with comprehensive functionality:
- Imports/Exports Improvements
- Updated Initiative/Idea import template file for compatibility with 5-stage pipeline implementations.
- Updated Initiative/Idea import template file for compatibility with 5-stage pipeline implementations.
- UI/UX Refresh
- Implemented standardized page layout framework being progressively rolled out across modules, with updates completed for:
- Meetings.
- Portfolios(PMO)/Organisation Management(CI).
- Import/Export.
- User Profile, Subscriptions, Delegations and Unavailability.
- Implemented standardized page layout framework being progressively rolled out across modules, with updates completed for:
- Value Hound Improvements
- Enhanced the VDT Definition 'Custom Target' Field type to allow future KPI values to be sourced for a custom date range.
- Enhanced the VDT Definition 'Custom Target' Field type to allow future KPI values to be sourced for a custom date range.
Bug fixes:
- Fixed 5 stages graphic on idea/initiative lists to properly display within columns
- Fixed text formatting on Idea Overview page to preserve paragraph breaks after saving
- Resolved 'My Actions' slide-out panel loading errors
- Fixed error handling in Scenario Planning, Forecast, Initiative Impact, and MACC functions when no activities exist
- Fixed issue where copied initiatives incorrectly inherited completion dates
- Resolved Initiative Card view failures when filtering by department
- Fixed '+Add VDT' button functionality in Value Hound when no VDT definition exists
- Restored role creation functionality on User page
- Fixed Bulk Ideas API error handling
- Corrected VDT Parent Node Chart to properly display Reference Nodes
- Fixed errors during KPI target imports
- Resolved authentication issues when emailing RARs
- Eliminated false error messages on VDT during library imports
For Version 2.11.1 (Released 21/01/2025)
- Emissions Module
- Fixed Emissions Non-Financial Benefit trends and Scopes functionality - trends now display correctly by Category.
- Fixed Emissions Scope values to correctly consider Emissions VDT Reference node values in Idea/Initiative Overview.
- Help Menu
- Removed legacy WiredUp user interface documentation, retaining only Help guides and FAQs relevant to the current experience.
- Idea/Initiative Management
- Corrected the Financial widget on the Performance and Overview pages to properly display current month data and differences between Forecast and Actual.
- Corrected display of Portfolios and Idea/Initiative workplan dates that appeared incorrectly and overlapped Action names.
- Fixed 'Reason for Changes' modal in Pipeline Targets appearing when no changes were made.
- Fixed KPI nodes with 'No Impact on benefit' not reflecting correctly in Benefits reports, API, and downloads.
- Fixed Non-Financial Benefit calculation issues in Idea/Initiative grid view, where Actual values from KPI nodes weren't sourced correctly.
- Fixed cross-site KPI dependency issue in VDT library imports.
- Resolved displayed error when loading the Idea Owner Review.
- Resolved issue where Bottom Up target changes weren't persisting despite successful confirmation messages.
- Updated Idea/Initiative Performance chart to properly display negative forecast or ongoing benefits in the Run Rate widget.
- Corrected VDT Parent Node Chart colours to properly distinguish between Actual, Baseline, and Target lines.
- Imports/Exports
- Corrected incomplete file names in Workplan exports caused by "/" characters.
- Fixed Export Job status indicators that remained stuck in "Processing" state despite successful completion.
- Fixed TRL/CRI import validation to properly enforce cascading relationships of fields.
- Fixed issue where Idea Export showed positive values as negative and vice versa for 'Total Cash Flow Actuals'.
- Resolved a displayed error when exporting Ideas/Initiatives and KPIs.
- Search & Filtering
- Fixed a Portfolio Workplan filtering issue where applying the date filter didn't update the Workplan.
- Fixed issues on the RAR & Meetings module, where the Idea/Initiatives search didn't return results until filtering by Portfolio.
- UI & Display
- Corrected Units of Measure symbol placement to respect configured setting (front/behind value).
- Fixed Outstanding Actions Indicator issues where assigning certain actions showed incorrect counts.
- Fixed Risk Management scroll behavior in Idea/Initiatives - scroll no longer appears when no content is present.
- Improved spacing between numerical values and Units of Measure to prevent overlapping.
- Value Hound & Idea/Initiative Value Driver Trees
- Added date validation on custom Period settings in VDT definitions to prevent invalid date ranges.
- Corrected 'Outcome' selection functionality on the Import from VDT Library dialogue.
- Fixed issue where load spinner appeared multiple times when accessing the linked Value Hound VDT.
- Fixed unhandled exception when exceeding the minimum character count for Value Hound VDT name.
- Updated VDT Template to accommodate constant node changes, resolving import validation failures.